Renovation
JANUARY - FEBRUARY
Phase 1
17 New CONCRETE FOOTING FOR TEMPORARY SUPPORTS
Pouring another 3 Truck Loads of Concrete
Before
2nd Floor - 314 Sanchez St
314 Sanchez St current condition:
- Both bedrooms are very small where the 2nd bedroom can only be access through the 1st bedroom or kitchen
- The one bathroom is completely dilapidated, feels very small and needs a total renovation
- The kitchen is small, isolated, and totally dilapidated and needs a total renovation
- The floor plan is out dated and segmented. The vestibule/foyer is very large and a wasted space
Garage Level - to be combined with 314 Sanchez St
Garage current condition:
- 4 car tandem parking
- 2 large dilapidated storage space
Top Level - 316 Sanchez St
316 Sanchez St current condition:
- Both bedrooms are very small where the 2nd bedroom can only be access through the 1st bedroom or kitchen
- The one bathroom is completely dilapidated, feels very small and needs a total renovation
- The kitchen is small, isolated, and totally dilapidated and needs a total renovation
- The floor plan is out dated and segmented. The vestibule/foyer is very large and a wasted space. There's a formal dinning room and a separate living room.
- Study is extra space that's unusable